KSh 15,000.00
Description
Energy Cabinet Secretary Charles Keter (right) flanked by his Energy PS John Njoroge during the tour of the 220/66kV Gas Insulated Switchgear (GIS) substation located at the city center on May 28, 2018. The substation is part of the Nairobi City Centre Network Upgrade and Reinforcement Project that is aimed at improving the flexibility of the power distribution system in Nairobi. The project is being implemented by TBEA of China at a cost of KShs.13.2 billion, funded by the Exim Bank of China through a twenty-year concessional loan.
Item Tags